Charterer’s claim

Charterer’s claim

A charterer alleged to have suffered losses as a result of misleading and deceptive conduct by the classification society in the classification of an offshore supply vessel. The charterer alleged…

Shipowner’s hull and machinery insurer’s claim

Shipowner’s hull and machinery insurer’s claim

In 2016, a bulk carrier suffered a stern shaft breakage during a voyage, causing the engine room to be flooded with seawater and leaving the ship out of control. The shipowner immediately arranged…

Shipowner’s claim

Shipowner’s claim

A classification society classed a ship from the time she was built until the end of 2015 when the ship switched to a new classification society. Four years later, the new classification society…

Shipbuilder’s claim

Shipbuilder’s claim

A naval architect designed a series of fast pilot boats. They completed the designs and submitted them to a classification society who advised that the forward stringers should be…

Offshore and Hydrographic Wire

Offshore and Hydrographic Wire

Offshore professionals operate in diverse areas. These include: seismic, hydrographic and geophysical surveyors; designers and naval architects of oil rigs, drill ships or FPSOs; design and…

Patent problems

Patent problems

An offshore engineering firm was engaged by the head contractor engaged in the construction of an offshore windfarm to design a subsea pile template (“SPT”) to be used to assist in the driving of…

Hydrographic howler

Hydrographic howler

A hydrographic surveyor was appointed to conduct a survey for a harbour authority. The surveyor made a mistake taking the readings as they had not allowed for the depth of the transducer on the…

Jack-up barge punches through sandy bottom

Jack-up barge punches through sandy bottom

An offshore consultant performed a site assessment for a jack-up crane barge. The site was known to have some inherent difficulties for jack-up operations due to the underlying layer of soft clay…

Resample required

Resample required

As part of a pipeline project a surveyor carried out geotechnical sampling which required the collection of samples at numerous stations. Unfortunately the surveyor did not follow proper procedures…

Subsea telecommunication cable

Subsea telecommunication cable

A consultant was engaged to notify all interested parties along a route of a new telecommunications cable. The consultant did this in accordance with its principal’s instructions. However, whilst…