A naval architect designed a series of motor yachts for a yard. As part of the design contract, they were required to provide a drawing showing the down flooding points of the yacht. This drawing was to be provided on an “as built” basis. However, the drawing was never provided.

13/07/2020
A naval architect was engaged to make modifications to a ship. The modifications included an additional 67 person accommodation unit.

STANDARD TERMS AND CONDITIONS FOR NAVAL ARCHITECTS IMPORTANT NOTICE  These terms and conditions are published for the general interest of members of ITIC. The...

Get a quote

Get a Quote

Fill in the relevant proposal form to receive a quote.

Make a claim

Make a claim

Guidance on how to report a claim.

Talk to our experts

Talk to our experts

Contact us at ITIC.
+44 (0)20 7204 2928

You are currently offline. Some pages or content may fail to load.