1837 results:

Fraud Watch

A ship agent received a request from a ship owner to deliver cash to Master of US$ 45,000 during a forthcoming call. Funds were remitted and received by the ship agent. A few days later the ship

Right to cancel

Ship brokers fixed a charter with the common laycan provision that if it appears to charterers that the ship’s arrival at the loading port will be delayed charterers may require owners to say when

Trading places

During the course of fixing a ship, the owner’s commercial manager provided a warranty to the potential charterer that the ship had not traded to Sudan in the past three years. However, the

Disputed design defects

A naval architect designed a motor vessel for a yard. Two vessels were built following the design. After the vessels were built and delivered to their respective owners, various deficiencies were

Missed messages

Missed messages

A shipbroker received a demurrage claim of US$ 80,000 by email to their fixture email address, “chartering@shipbroker.com”. However, the recap stipulated that all claims must be sent to

Tariff trouble

Tariff trouble

A hub agent was appointed as the ship’s protective agent by the owner. The charterer was an oil major. Two months after the ship called at a Libyan port, the local sub-agents appointed by the agent

Test rained off

Test rained off

Hull and water damage became apparent on a boat, which the owner alleged should have been noted during a survey but had been missed by the surveyor. The claim total was US$ 33,000 and court

Time and tide wait for no agent

Time and tide wait for no agent

A ship agent arranged pilots for a tanker which was due to depart a terminal in the US. The agent was aware that due to the ship’s length a daylight departure was required as per the local pilot’s

A restricted defence

A restricted defence

The charterer asked the agent whether there were any restrictions which might cause problems for the ship at the discharge port. The agent telephoned the terminal who advised, verbally, that there

Incorrect calculations

A naval architect was appointed to re-design and certify part of a mast support structure on a yacht. The yacht was being converted into a luxury vessel to be used in commercial