Persistence pays

Shipbrokers notified ITIC of their concern about outstanding commission owed to them by time charterers, who were widely thought to be in financial difficulties. The charterparty provided that the…

The penalties of stowaways

When a vessel was attempting to leave the berth, the presence of a stowaway onboard was discovered. The ship agent immediately contacted the Immigration Authorities to ask them to remove the…

Don’t rock the boat

A yacht broker incorrectly marketed a yacht as having zero speed stabilisers, which it in fact did not have. The owners of the yacht brought a claim against the broker alleging that this…

Forbidden scrap

A liner agent accepted, on behalf of a shipping line, a cargo of scrap plastic from the southern hemisphere to the Far East. Unfortunately the agents had previously received instructions from their…

A tidal change

In early 2011 a ship agent at a tidal port in Japan was asked to provide a tide table to enable the owner of a ship to calculate the permissible drafts for the dates his ship was due to berth at the…

Berth booking blunder

Ship owners appointed a port agent for the call of their vessel for bunkers. The agent failed to complete the required customs formalities in time to book the berth. Unfortunately, this mistake went…

Stability study

A naval architect in France provided a stability study on a barge which guaranteed it would remain stable up to a maximum cargo load of a specific weight. The condition of this guarantee…

Documentation disclosure

A manager for a number of cruise ships was sued by the shipowners in a court in the USA in respect of alleged failure to oversee the maintenance, negligence in the provision of the manning and…

Surveyors sued for loss of evidence

A firm of surveyors was appointed by an insurance company to investigate the cause of a fire at a factory in America. The cause of the fire was alleged to be a faulty forklift truck. Following…

Defective design

A marine engineering consultancy designed a seawater storage tank for a newly built power plant. They were instructed by a major European engineering contractor. After its construction, cracks…