Fixture failure


  • Date: 01/11/2018

A commercial management agreement provided that the managers could not fix the ship for more than a specific number of days without approval. The managers failed to obtain express approval for a
fixture which (at its longest permitted period) could extend beyond the authority they had been given.

When the market rose towards the end of the fixture the owners claimed for difference between the fixture rate and the prevailing market. The managers protested that the owners had been aware of the fixture but there was nothing in writing before the fixture was made and they had not followed the process set out in the ship management agreement.

A compromise was reached.

Obtenir un devis

Get a quote

Remplissez le formulaire de demande de tarification approprié pour obtenir un devis.

Faire une déclaration de sinistre

Make a claim

Conseils sur la façon de faire une déclaration de sinistre

Parler à un de nos experts

Talk to our experts

Contactez-nous à l’ITIC
+44 (0)20 7204 2928

You are currently offline. Some pages or content may fail to load.